Skip to content
Site checks & handover6 min read

Pre-handover site check guide: recording defects clearly before getting the keys

Your pre-handover walkthrough is your best opportunity to verify that every paid Upgrade was installed as signed and that paint, joinery, tiling, and plumbing are finished cleanly before final payment.

Key takeaways

  • Bring your signed room-by-room selection list and Lights & power plan — missing power points or swapped tapware models are easy to overlook when admiring the finished house.
  • Inspect paint, plaster, and glazing in natural daylight at standing distance in line with industry workmanship tolerances.
  • Log each Defect with the exact room name, a clear wide photo for location, and a close-up photo so trades can fix it on the first visit.
  • Consider booking an independent licensed building inspector alongside your own selection check.

1. Verify every chosen finish and paid Upgrade first

Independent building inspectors are brilliant at checking structural tolerances, roof flashing, waterproofing falls, and compliance — but they rarely know whether you paid extra for soft-close pantry drawers, a specific stone edge profile, or three two-way light switches.

Walk room by room with your Chosen selection list and tick off every benchtop, cabinet colour, handle, tap, basin, tile layout, appliance model, and power point.

2. Room-by-room practical site check routine

Work methodically clockwise around each room from ceiling to floor so you never lose your place while chatting with your site supervisor.

  • Doors & windows: open, latch, and lock every door and window; check for binding frames, missing doorstops, or scratched glass.
  • Joinery & benchtops: open every drawer and cupboard door together to check even gaps, soft-close hinges, silicone neatness, and chip-free stone edges.
  • Wet areas & plumbing: run hot and cold taps, check under vanity pipes for drips, test shower screen seals, and inspect tile grout and silicone joints.
  • Walls, ceilings & floors: check plaster corners, skirting mitres, paint cut-ins, and floorboards for construction dents or hollow spots.
  • External & drainage: check downpipes, driveway/path clearances, weep holes, meter box labelling, and exterior tapware.

Common questions

Should we still hire an independent building inspector for handover?

Yes — a qualified independent inspector checks structural compliance, roof spaces, moisture readings, and Australian/local standards, while your own checklist ensures every contracted finish, colour, and electrical point matches what you paid for.

How should we share our defect list with the site supervisor?

Group items by room with numbered titles, short factual descriptions, and clear photos in a single PDF or spreadsheet report so your supervisor can assign trades cleanly and tick off each item before handover.